Power and decarbonisation modelSHIFTM PDX

Two answers from one model: which power supply your site should build, and which decarbonisation pathway creates the most value. A change to the mine plan flows through power, emissions, Safeguard and NPV in one pass.

6

Power supply options: diesel, gas, grid, solar, wind and battery

50

Fleet technology options

3

Engines on one site dataset

Two answers, one model

Power and decarbonisation, solved together.

Power

What power supply should your site build, and when?

  • Six supply options: diesel, gas, grid, solar, wind and battery
  • Hourly, seasonal dispatch, not annual averages
  • Each addition valued against what you have already committed
  • What each year of grid connection delay costs

You getThe power mix that suits your fleet plan, costed to NPV

Decarbonisation

Which emissions cuts create value, and what do they mean for Safeguard?

  • 50 fleet technology options, ranked on seven criteria
  • Scope 1 and 2 trajectories for every pathway
  • Safeguard baselines, ACCU and SMC ledgers, year by year
  • AASB S2 scenario analysis and a transition plan

You getA ranked pathway, its cost per tonne abated, and your carbon liability in cash

One dataset links them. Electrify the fleet and the extra load flows through the power mix, then into emissions, Safeguard and NPV in one pass.

Ways in

From a first look to an annual refresh.

  1. 01Your public data

    Public baseline

    Your energy use, emissions, Safeguard position and likely carbon cost, built from public CER, NGER and ASX data.

    Use it when

    You want a first view of power and emissions before sharing any site data.

    You get

    A baseline briefing for the first conversation

  2. 02Your site data

    Working session

    The baseline calibrated with your mine plan, fleet and power data, and the power supply and fleet options that matter shortlisted with your team.

    Use it when

    Early in a power supply, decarbonisation or Safeguard review.

    You get

    A calibrated baseline and a power and fleet shortlist

  3. 03Full model

    Decision study

    Power supply and fleet pathways run together with compliance: costed supply options, ranked pathways, NPV and cost per tonne, and a sequenced roadmap.

    Use it when

    Before a board decision, a power contract or an AASB S2 disclosure.

    You get

    An auditable Excel model, a written report and a roadmap

    Example: a board-ready roadmap for PLS in 12 weeks

  4. 04Every year

    Annual refresh

    The model rerun as power and fuel prices, technology, your mine plan and Safeguard baselines change.

    Use it when

    Each reporting year, or when a major assumption shifts.

    You get

    An updated power mix, pathway, Safeguard position and AASB S2 numbers

Every step builds on the same site dataset, so a first look becomes the decision model without starting again.

How it works

One dataset, seven connected parts.

Select a part

Mine plan. We start from your mine plan. Ore and waste movement and the fleet schedule become diesel and tCO2-e by machine class, calibrated to measured site fuel where you have it.

You getA baseline built from how the mine actually runs.

What you receive

Numbers your board can sign off.

  • The power mix and supply timing that suits your site
  • NPV, IRR and cost per tonne for every option and pathway
  • Your Safeguard position and AASB S2 trajectories, year by year
  • An auditable model you keep, and a written report

Every engagement starts from your public CER, NGER and ASX data, and every value carries a source and a confidence tier: disclosed, derived or estimated.

Facing a power or decarbonisation decision? Tell us about the site.